Why four markets need four different answers

A buyer in Rotterdam, a buyer in Manchester and a buyer in Houston can open the same drawing and ask the same question: is this cable gland certified? The word hides four different things. In the EU it means an EU-type examination certificate against Directive 2014/34/EU and a CE mark. In Great Britain it means a UK-type examination under the 2016 Regulations and a UKCA mark, or, since October 2024, a CE mark accepted as equivalent. Under IECEx it means a Certificate of Conformity anyone can look up in a public database. In the United States it means a listing mark from a recognised testing laboratory, because the National Electrical Code issues no certificates to manufacturers at all.

One casting number can therefore need three or four separate files before the same gland is released in four countries. The technical test behind them is usually IEC 60079 series. The legal act is not, and that is where project schedules break.

ATEX certified brass cable gland installed through a painted steel enclosure wall
The gland on site does one job. The certificate that allowed it there is a separate document, issued by a body with its own jurisdiction.

The four regimes at a glance

Read the third column first. It tells you who can stop your shipment.

MarketLegal basisWho makes the decisionWhat is marked on the gland
EU / EEAATEX Directive 2014/34/EUNotified body for Category 1 and 2; manufacturer self-declares Category 3CE, Ex hexagon, equipment group and category, notified body number where a body is in production control
Great BritainEquipment and Protective Systems Regulations 2016 (SI 2016/1107)UK approved body; CE also accepted under the 2024 amendmentUKCA, Ex hexagon, group and category, approved body number
Northern IrelandEU rules under the Windsor FrameworkEU notified bodyCE, with UKNI added if a UK body carried out the assessment
IECEx member countriesIECEx 02, a voluntary certification systemEx certification body, testing by an Ex testing laboratoryCoC number on the label; the IECEx mark itself only under a separate licence
United StatesNFPA 70 (NEC) plus the OSHA NRTL frameworkAn NRTL such as UL, FM, Intertek or CSA, then the authority having jurisdictionListing mark, plus Class/Division or AEx zone marking
CanadaCSA C22.1 (Canadian Electrical Code)SCC-accredited certification bodycUL or CSA mark, bilingual labelling

The asymmetry matters commercially. In the EU and the UK a government-appointed body decides. Under IECEx a scheme decides, and the certificate is public. In North America no federal body certifies the product: a laboratory lists it and a local inspector accepts the installation. No supplier declaration replaces any of them.

ATEX is an EU directive, not an international scheme

Our ATEX versus IECEx comparison covered the two-directive structure; here the question is narrower. An Ex certificate is issued for a defined product, built at a named manufacturing location, under an audited quality system. Change the factory and the quality assessment no longer describes reality. Change the body material and the certificate may no longer describe the product. Assemble the gland into an enclosure certified with a different entry and the gland certificate stays valid while the assembly does not.

A CE mark on a brass gland tells you the gland conforms. It does not tell you the combination of gland, enclosure and cable on site conforms, because that judgement belongs to the installation standard and, at the end, to the inspector.

IECEx is three documents and a separate mark licence

Suppliers often send one PDF and call it the IECEx certificate. The scheme produces three documents, and they answer different questions.

DocumentIssued byWhat it provesWhat it does not prove
ExTR, Ex test reportAn Ex testing laboratory, endorsed by the certification bodyThe type was tested and assessed against the named IEC 60079 standardThat production copies the type
QAR, quality assessment reportThe certification body, after an on-site auditThe manufacturing site’s Ex quality system meets ISO/IEC 80079-34That a specific batch came off that audited line
CoC, certificate of conformityThe certification body, only after the ExTR and QAR existDesign, manufacturing system and ongoing surveillance togetherA right to print the IECEx mark
Conformity mark licenceThe certification body, under IECEx 04Permission to use the IECEx mark on the productAny technical fact the CoC does not already state

Two habits follow. Ask for the CoC number and look it up in the IECEx online certificate system, because the scheme states that equipment not listed there is not IECEx certified. Then treat the mark and the certificate as separate rights: a gland with a CoC number and no logo is not automatically non-compliant, while a logo with no CoC behind it is the problem.

The UK route: UKCA exists, CE is still accepted

The most commonly outdated line on a datasheet is still “UKCA required for the UK”. The Product Safety and Metrology etc. (Amendment) Regulations 2024, in force since 1 October 2024, recognise CE marking indefinitely for a list of regulations that includes explosive-atmosphere equipment, so a CE-marked ATEX gland can be placed on the GB market without UKCA. Northern Ireland is not covered: EU rules apply there, so CE, with UKNI added when a UK body performed the mandatory assessment.

UKCA, or UKEX as the Ex scheme is usually called, remains a real route. A UK approved body carries out a UK-type examination under the 2016 Regulations, and the mark is followed by that body’s four-digit number where it is involved in production control, then the Ex hexagon, group and category. What changed is its status. For most GB placements it is now a customer requirement rather than a legal necessity, so budget for it when the buyer’s procedure asks.

North America: a listing, not a certificate, and usually a sealing fitting

The NEC is an installation code. It does not certify products; it says what may be installed and refers the question to listing. A US hazardous-location cable entry is expected to carry a listing mark from an OSHA-recognised NRTL, and the product standard covering cable fittings for classified locations is ANSI/UL 2225, whose scope runs across Class I Division 1 and 2 Groups A to D, Class II Division 1 and 2 Groups E to G, Class I Zone 1 Groups IIA to IIC and Zones 20 to 22 Groups IIIA to IIIC, all in accordance with NFPA 70.

The vocabulary differs too: explosionproof for Class I and dust-ignitionproof for Class II in North America, flameproof Ex d and protection by enclosure Ex t in the IEC world. A product can satisfy both technically and still fail one market’s paperwork, because the marking format is not the same.

The largest design gap is not the gland. In Class I Division 1 a cable leaving a raceway into an enclosure generally needs a cable seal, and the code accepts two ways of providing it: a listed sealing fitting filled with compound, or one of the gas-blocked constructions such as MC-HL, ITC-HL or TC-ER-HL, which is what Part I of UL 2225 covers. A European compression gland sealing on the sheath keeps water out; it does not stop gas migrating through the cable core. That is why a US drawing carries a sealing fitting the EU drawing of the same skid does not.

One machine, four document sets

For a single skid exported to four destinations, the evidence pack is not one file translated four times.

DestinationEvidence the buyer will ask forWho signs itWhat usually delays it
EUEU-type examination certificate, declaration of conformity, quality assurance notification where module D or E appliesNotified body and manufacturerTest slot, then the factory quality audit
Great BritainThe EU pack, or a UK-type examination certificate and a UKCA declarationUK approved bodyA separate application even when the same test evidence is reused
IECEx marketsCoC, ExTR and QAREx certification bodyThe on-site quality audit, which is independent of the tests
United StatesNRTL listing record for the fitting, evaluated to UL 2225, plus the installation detail the inspector expectsNRTL, accepted by the authority having jurisdictionSample submission and the factory follow-up inspection
CanadacUL or CSA certification plus bilingual markingSCC-accredited bodyMarking artwork and label approval

Schemes outside these four, such as INMETRO in Brazil, TR CU 012/2011 in the Eurasian Union, PESO in India or ANZEx in Australia, normally accept an IECEx ExTR and QAR as the technical input and add their own certificate on top. That is the argument for holding IECEx first: it is the only regime whose documents are designed to be handed to somebody else.

What transfers between markets

DeToWhat can be reusedWhat cannot
IECExEUExTR as supporting evidence in the technical fileThe certificate itself; an EU-type examination is a separate act
IECExGreat BritainExTR and QAR, accepted as input by UK approved bodiesThe certificate; a UK-type examination is still required
ATEXGreat BritainThe whole CE file, since October 2024Nothing, provided the certificate has not expired or been superseded
ATEX or UKCAIECExTest data, if the laboratory is acceptable to the certification bodyThe certificate; a CoC is issued under IECEx rules only
Any Ex certificateUnited States or CanadaVery little beyond design evidenceListing and certification, which are national acts

Nothing European converts into a North American listing, and nothing North American converts into an Ex certificate. The test philosophies overlap; the administering bodies do not.

Nickel-plated brass and 316 stainless steel cable glands side by side
The same gland in two materials may share a certificate while differing in the markets that accept it and in how long it survives on site.

Five questions that settle the route before you quote

Most certificate disputes on a cable gland order are specification disputes that were never closed.

  1. Where is the installation, not the delivery? A skid built in Asia for a Texas site needs a US listing even though nothing enters Europe.
  2. What entry does the enclosure certificate permit? The gland certificate and the enclosure certificate have to name compatible entries, and that pairing is fixed before the gland is chosen.
  3. Division or Zone? This decides the marking format and often the sealing arrangement, not the casting.
  4. Does the buyer’s own procedure require UKCA on top of CE? Legal minimum and contractual requirement are different thresholds.
  5. Who is the authority having jurisdiction, and what does it accept as evidence? On US and Canadian projects this question outranks the other four.

Once those are answered, ordering becomes a variant question rather than a compliance one. Our explosion-proof range ships as nickel-plated brass with ATEX and IECEx certification, or as certified 316L stainless steel for chloride and washdown exposure, at 300 pieces per size minimum, FOB Ningbo or Shanghai. Each shipment carries the Ex certificate, the IP68 test report to IEC 60529, the CE declaration, RoHS and REACH statements, and a material certificate to EN 10204.

VariantCertification heldWhere it is installedIndicative FOB price
Explosion-proof brass, nickel-platedATEX and IECEx, IP66 to IP68 plus ExZone 1 and Zone 2 gas, refinery skids, chemical plantUSD 3.10 to 4.80
Explosion-proof 316L stainless steelATEX and IECEx, IP66 to IP68 plus ExOffshore platforms, chloride-rich areas, washdownUSD 5.00 to 7.20
Standard nickel-plated brassCE, RoHS, REACHSafe area switchgear and machine toolsUSD 0.44 to 0.75
EMC shielded brassCE, RoHS, REACHVFD motor and drive cabinets in safe areaUSD 1.55 to 2.60

Prices are indicative FOB Ningbo or Shanghai for 1,000 pieces per size, Ex 300 pieces per size, and move with copper, nickel and freight.

Frequently asked questions

Is an IECEx certificate accepted in the European Union?

No. ATEX is the legal route into the EU, and the EU-type examination certificate is what the declaration of conformity refers to. An IECEx ExTR is useful evidence inside the technical file and can reduce the testing a notified body asks for, but it does not replace the certificate.

Do I still need UKCA marking for Great Britain?

For most placements, no. Since 1 October 2024 CE marking has been recognised indefinitely for explosive-atmosphere equipment on the GB market. Northern Ireland follows EU rules and needs CE, with UKNI where a UK body carried out the assessment.

Can ATEX-certified glands be installed in the United States?

Not on the strength of the ATEX certificate. US practice expects a listing mark from an OSHA-recognised NRTL, with the fitting evaluated to UL 2225, and Class I Division 1 usually adds a cable seal. The hardware may be identical; the approval is not.

Is a cable gland certified as equipment or as a component?

Ask, because the two are not interchangeable. Under IECEx rules an Ex component is defined as a part other than an Ex cable entry, so a gland is certified as equipment in its own right. ATEX allows a component certificate under Article 13(3), which carries no CE marking and ships with a written attestation instead.

Does the Ex certificate cover the gland once it is installed?

No. It covers the product as manufactured. Selection and erection are governed by IEC 60079-14 in IECEx countries and by the NEC in the United States, and final acceptance belongs to the inspector. Keep the installation record, because that is what a site audit asks for.

Publicações relacionadas

Cable Gland Earthing and Bonding Guide

Cable Gland Earthing and Bonding Guide

Earthing and bonding do different jobs. The three return paths a gland can provide, the seven interfaces that break continuity, and how to test them on site.

Leia mais