صمامات دخول الكابلات المقاومة للماء: الأنواع، والأحجام، والتركيب
اكتشف غدد إدخال الكابلات المتينة المقاومة للماء مع تصنيف IP68 المصنوعة من النحاس النايلون أو الفولاذ المقاوم للصدأ للاستخدام الآمن في الهواء الطلق والاستخدام البحري
قراءة المزيد
Packing is the last line on a quotation and the first thing to go wrong at the destination. Two numbers decide all of it: how much one gland weighs, and how much space it takes. Carton count, freight per piece and whether the count is right at the far end all follow from those two, and neither is printed on most datasheets.
This page sets out how to establish both without a published figure, how a carton quantity is actually calculated, and which packing lines belong on the purchase order rather than in a claim six weeks later. The cost side of the same order is on the cable gland price guide.
A purchase order says “packing” and means at least four separate decisions. They fail in different ways, and only one of them is usually written down.
| Level | What it fixes | What goes wrong without it |
|---|---|---|
| Unit — one gland | The insert keeps its shape, the thread stays undamaged | Inserts take a permanent set under load in a loose sack |
| Inner — poly bag per size | Count integrity and size separation | Mixed cartons, short count at the end of a build |
| Outer — export carton | Handling weight and corner protection | Over-weight cartons refused at the dock; crushed corners |
| Unit load — pallet | Mechanical handling and stacking strength | Hand-unloaded containers, collapsed bottom layer |
| Marking | Identification on receipt and at customs | Cartons opened just to find out what is inside |
Bagging per size is a packing instruction rather than an added cost item, and it is the single line that prevents the most common dispute: a bulk carton of small glands that arrives two hundred pieces short after a month on site.

There are three legitimate ways to get the number, and they answer slightly different questions. Confusing them is how freight gets under-quoted.
| الطريق | What it gives | When it can be trusted |
|---|---|---|
| Supplier datasheet | Usually a packed gross weight per carton | Only if it separates net part mass from carton and bag |
| Weigh ten pieces | Part mass to within a gram | Always; it is the only figure measured on the actual goods |
| Hex envelope calculation | An upper bound on the brass blank | Brass only — a moulded nylon body is not turned from hex bar |
| Carton gross weight on the packing list | The number the forwarder will use | At shipment, for freight; not for design |
The envelope calculation is worth knowing because it needs no supplier input: a brass blank is a hexagonal prism whose across-flats equals the body spanner size, so volume is 0.866 × across-flats squared × cut length, and brass runs at 8.4 g/cm³. It over-states the part, because the blank ends at the shoulder and everything turned away leaves as swarf, but it ranks sizes correctly and it makes an implausible datasheet figure obvious at a glance.
A carton quantity is not chosen. It is whichever of two limits is reached first: the handling weight of a full carton, or the usable volume inside it once the packing has taken its share.
Pieces per carton = the lower of (carton weight limit ÷ gross mass per piece) and (usable volume × fill factor ÷ unit envelope). The fill factor for loose glands in a bagged carton sits near a third to a half of the box; the rest is air and bag.
| العنصر | Brass M20 | Nylon M20 |
|---|---|---|
| Gross mass per piece (assumed input) | 60 g | 12 g |
| Carton 600 × 400 × 300 mm, 72 L | 20 kg limit | 20 kg limit |
| Pieces allowed by weight | 333 | 1,666 |
| Unit envelope (cm³) | 10.5 | 18.9 |
| Usable volume at 0.35 fill (cm³) | 25,200 | 25,200 |
| Pieces allowed by volume | 2,400 | 1,333 |
| Carton quantity that binds | 330 — weight | 1,300 — volume |
The inputs above are a worked example, not a catalogue figure: substitute the measured mass and the supplier’s carton dimensions and the arithmetic gives the real count. What the example demonstrates is that the binding limit swaps between materials at the same nominal size.
نحاس at 8.4 g/cm³ is dense enough that a small carton reaches a sensible handling weight long before it is full. نايلون at about 1.14 g/cm³ is roughly seven times lighter for a similar envelope, so its cartons fill up on space and never approach the weight limit — which means nylon pays far more freight per piece relative to its own piece price, even though the freight per kilogram looks cheaper.
The relationship also turns over at the top of the brass range. At M50 and above, glands are bulky parts and the export carton is sized per piece rather than per weight, so the count is set by how they stack, not by what they weigh. Per-size dimensions, including the body thickness that sets the envelope, are listed on the standard nylon series and the brass range separately.
Seven lines cover almost everything that goes wrong in transit. They belong on the order, because a supplier cannot guess which ones matter for a sea freight or an air freight shipment.
| السطر | What to state | لماذا هذا مهم؟ |
|---|---|---|
| Board grade | Five-ply export grade for sea freight | Stack strength at the bottom of a container |
| Internal dimensions | Length × width × height in millimetres | Carton count, CBM and the freight calculation |
| Gross weight | Maximum per carton, and the actual figure | Manual handling limits and dock acceptance |
| Inner packing | Poly bag per size, quantity per bag | Count integrity through to the build stage |
| Closure | Water-activated tape, two strips | Cartons that open in transit lose pieces, not labels |
| Marking | Size, quantity, batch, protection rating | Receiving without opening every box |
| Pallet | Heat-treated timber, 1200 × 1000 footprint | Phytosanitary compliance on wood packaging |
Corrugated board is the one line that is usually absorbed by the supplier. It shows up only when the carton count is high, which is another way of saying that small, light, expensive parts are the ones whose packing cost is invisible in the piece price.
Container freight is bought in cubic metres, so the figure that matters is cartons per pallet times pallets per container — not the weight. A 1200 × 1000 pallet at 1.8 m including the pallet itself holds about twenty-four cartons of 600 × 400 × 300, and a 20 ft container takes ten such pallets, or twenty if they are single-stacked and the height allows.
That is a rough envelope, and it changes with stack height and pallet pattern. What does not change is the ordering: agree the carton dimensions before the freight is booked, because the difference between a 300 mm and a 400 mm carton height is a third of the container.

The fragile part of a cable gland is not the metal. It is the elastomer insert, which is designed to be compressed once and hold that compression for years; a carton stacked three high for six weeks applies a compression nobody designed for, and the insert comes out with a set that shows up as a leak at commissioning.
Two habits prevent it. Keep the glands in their bags so the load is shared by the bag rather than borne by a single insert, and keep the cartons within the gross weight stated on the order so the bottom layer is not carrying more than the board was specified for. Dome nuts with a coarse thread can also be dented on the crest, and a dented crest is a thread that will not start cleanly on site.
Write the packing lines into the purchase order rather than the email thread. The minimum useful set is: bag per size, quantity per bag, quantity per carton, carton dimensions, gross weight, pallet type and marking text. If locknuts and washers are supplied, say whether they are bagged with the body or separately, because a locknut loose in a carton of M20 bodies is the most common cause of a mixed count — the accessories guide sets out which parts are normally packed with the gland and which are not.
The order line also decides what can be checked at goods-in. Five lines of packing instruction give the receiving team five checkable facts; “export packing” gives them none.
Shipping marks on the carton and the classification on the paperwork have to agree, because customs reads both. Cable glands are not classified as a single article — النحاس, stainless و نايلون bodies do not fall in the same heading, and the HS code guide covers the difference and what supporting evidence a broker will ask for.
Marking should carry the size, the quantity in the carton, the batch or date code and the protection rating, because those four are what the receiving inspection checks. Anything else on the label is decoration. Wood packaging needs heat treatment and the ISPM 15 stamp, and every carton needs to survive being handled by someone who has no idea what is inside.
It depends on which limit is reached first. For small brass sizes the 20 kg handling weight is reached long before the box is full; for the same nominal size in nylon the carton fills on volume. The calculation is carton weight limit divided by gross mass, against usable volume divided by unit envelope.
Weigh ten and divide. That is the only figure measured on the actual goods, and it takes a minute. A datasheet figure is only useful if it separates the packed gross weight from the net part mass, and a geometric estimate from across-flats gives an upper bound rather than a shipping weight.
Because freight is bought on volume, and nylon at about 1.14 g/cm³ is roughly seven times lighter than brass for a comparable envelope. A carton of nylon glands fills up long before it reaches a useful weight, so the freight per piece is a much larger share of a much smaller piece price.
Rarely. Bagging per size is the useful level: it keeps sizes separate, protects the inserts from each other and makes counting possible. Individual bags are specified for retail packaging or for parts that will be issued one at a time from a stores counter.
It can. Bulk cartons ship from stock programmes, while bagging per size, individual labelling and printed retail headers add a handling step after production. State the requirement at enquiry so it is priced and scheduled with the goods rather than added at shipment.